One question, two numbers
A boarding facility has two figures that get confused constantly.
- The rate — what a customer pays for one night. Public, comparable, and set by the market you operate in.
- The cost per occupied run-night — what it costs you to deliver that night. Private, because it depends entirely on your building, your layout, your staffing and your equipment.
A facility is viable when the second sits below the first. No price survey can publish the second figure, because it is site-specific. But it can be calculated, and the calculation is the same for every facility.
The four lines an occupied night has to cover
Operationally, every occupied run-night carries four cost lines:
- Capital and depreciation — the runs, the building envelope, drainage, doors, kennel furniture.
- Labour — feeding, walking, supervised play, medication, cleaning, reception.
- Sanitation and consumables — disinfectant, bedding, laundry, water, utilities.
- Repair, replacement and lost nights — the parts and labour to return a run to service, plus the nights it could not be sold.
The first is fixed at purchase. The other three recur every day the facility is open, and two of them — cleaning within labour, and downtime within line four — are directly affected by how the enclosure is built.
Calculating your own cost per occupied run-night
Every figure below is a variable you supply. No benchmark is implied, because none is published.
Step 1 — capital cost per occupied night.
capital cost per occupied night = unit cost ÷ (service years × 365 × occupancy rate)
A run that is empty or out of service still has to be paid for. That is why occupancy belongs in the denominator, rather than the number of nights you would like to sell.
Step 2 — add the running lines.
cost per occupied run-night = capital per night + labour per night + sanitation per night + repair and downtime allowance per night
Step 3 — compare against the rate you can actually charge. That rate is your ceiling, not your target. Whatever your cost per occupied run-night works out to, the business only works while it sits below what your market will pay.
The value of running this calculation is not the answer. It is that every input becomes something you can measure, negotiate or design around before you place an order.
Where the enclosure enters the calculation
Capital. The purchase price is the easiest figure to obtain and the least interesting. It enters once, divided across the service life and the occupancy rate.
Cleaning labour. Ask a supplier how long a full clean of one run takes — base rail, fixings, door track and floor junction included. Then multiply by your daily cleaning cycle and your run count. Surface design, exposed fixings and panel joints are the variables that move this number.
Downtime. Ask what replacing one damaged panel actually involves: which tools, how many hours, whether the adjacent runs have to come out. Then price those hours at your nightly rate, plus the booking you had to turn away.
Reconfiguration. Ask whether panels can be re-arranged on site without cutting steel, and what a two-run-to-suite conversion costs. The balance between standard runs and larger suites does not stay fixed, and a layout that cannot be re-cut is a layout you live with.
Separation. Ask whether an isolation space can be created without a separate build, and where it sits relative to the main runs, the aisle and the drain.
Specification questions to put to any supplier
Ask for written answers, not catalogue photographs:
- Steel grade and wall thickness — 304 or 316 stainless, or galvanised, and which coating system?
- Frame section size, and mesh aperture and wire diameter.
- How panels join: bolted, bracketed, or welded on site. What happens when one panel is damaged?
- Floor: drained, sloped, or supplied with a raised platform? Where does washdown water go?
- Can the configuration be changed later without cutting steel?
- Gate and hinge design — exposed or concealed, and how the latch is specified.
- Stated service life, and what the warranty excludes.
- Load and stacking plan if a second tier is added later.
- Dimensioned layout drawings against your aisle width and door swing.
- Shipping configuration, packing method, and MOQ per model.
What we manufacture
Famebest produces modular boarding runs, breeding kennels, cat boarding units, veterinary cages and horse stables, in 304 stainless steel with HDPE panels and tempered glass or mesh door options. Standard frames are 30 × 30 mm with 2.0 mm wall thickness, mesh is 50 × 50 mm in 4 mm wire, and panels are modular so a boarding block can be re-cut into suites without new steel.
If you are planning a facility, send a floor plan, your aisle width and your target nightly rate, and we will return a dimensioned layout and a per-run cost you can put straight into the calculation above.